Project estimates

ClientsExplainerUpdated November 2, 2026

Before starting a project, it's reasonable to want a sense of what you're getting into. An Estimate gives you that: what the work would approximately cost and how long it would take, as a Low, Mid, and High range. This page explains what an estimate contains, how to read it, and why it can change.

We give you the best planning information we reasonably can with what's known today, and we're open about the fact that software contains uncertainty.

Why we estimate​

  • You deserve a sense of scale. Knowing whether a project is a modest addition or a major undertaking helps you decide whether and how to start.
  • A range helps you plan. You can budget, decide what matters most, and choose what to build first, before and during discovery.
  • Software contains uncertainty. A single precise number would suggest more certainty than anyone has before the work begins. An honest range is more useful than a false exact figure.

What an estimate looks like​

Here is a fictional example. The project estimate at the top is the part most clients care about: Low, Mid, and High, with what the whole project would cost and how many weeks it would take on each block. Below it, each Focus shows what we currently expect to build, what we're assuming, and its own cost and weeks. Hover over or tap a size to see what it means.

Example estimate · fictionalService scheduling portal

A small home-services company replaces its phone-and-spreadsheet scheduling with an online portal.

Project estimate
LowMidHigh
Flex~$34,00017 weeks~$48,00024 weeks~$72,00036 weeks
Core~$31,8758½ weeks~$45,00012 weeks~$67,50018 weeks
Dedicated~$29,7504¼ weeks~$42,0006 weeks~$63,0009 weeks

Low if the work goes favorably, Mid as expected, High with reasonable extra complexity. At $7,000 a week on Dedicated, $3,750 on Core, and $2,000 on Flex. A planning estimate, not a quote.

Weeks assume one block of that type every week, one Focus at a time: more blocks a week shortens the timeline; fewer, or gaps between them, lengthen it.

Staff AccessS

Office staff and technicians sign in with their existing Microsoft 365 accounts.

Notes
  • Only people in the company's Microsoft 365 organization can sign in.
  • Assumes the company's Microsoft 365 tenant permits the required sign-in access.
LowMidHigh
Flex~$2,0001 week~$4,0002 weeks~$6,0003 weeks
Core~$1,875½ week~$3,7501 week~$5,6251½ weeks
Dedicated~$1,750¼ week~$3,500½ week~$5,250¾ week
Customer SchedulingM

Customers can request a service appointment online.

Notes
  • Customers choose a service type and a preferred time window, and can cancel up to a day before.
  • Customers cannot book outside the company's service hours.
  • Assumes a short, fixed list of service types.
LowMidHigh
Flex~$6,0003 weeks~$8,0004 weeks~$12,0006 weeks
Core~$5,6251½ weeks~$7,5002 weeks~$11,2503 weeks
Dedicated~$5,250¾ week~$7,0001 week~$10,5001½ weeks
Technician DispatchL

Dispatchers can assign technicians to scheduled service appointments.

Notes
  • Dispatchers see each technician's day and week, and are warned before double-booking one.
  • Technicians can see only their own assigned appointments.
  • Assumes travel time between appointments doesn't need to be calculated.
LowMidHigh
Flex~$12,0006 weeks~$16,0008 weeks~$24,00012 weeks
Core~$11,2503 weeks~$15,0004 weeks~$22,5006 weeks
Dedicated~$10,5001½ weeks~$14,0002 weeks~$21,0003 weeks
Automated NotificationsS

Customers are kept informed about their appointments by email and text.

Notes
  • A confirmation email when a request is received, and a reminder text the afternoon before.
  • Assumes a standard SMS provider such as Twilio is fine.
LowMidHigh
Flex~$2,0001 week~$4,0002 weeks~$6,0003 weeks
Core~$1,875½ week~$3,7501 week~$5,6251½ weeks
Dedicated~$1,750¼ week~$3,500½ week~$5,250¾ week
InvoicingL

Completed appointments become invoices in the company's accounting system.

Notes
  • Marking an appointment complete creates a draft invoice in QuickBooks Online, and failed syncs are flagged.
  • Assumes QuickBooks Online's API supports the company's invoice layout.
  • Assumes existing customer records in QuickBooks don't need to be cleaned up or migrated.
LowMidHigh
Flex~$12,0006 weeks~$16,0008 weeks~$24,00012 weeks
Core~$11,2503 weeks~$15,0004 weeks~$22,5006 weeks
Dedicated~$10,5001½ weeks~$14,0002 weeks~$21,0003 weeks
Project notes
  • The portal is a web app that works well on phones; no app-store app is needed.
  • The company's existing website only needs a link to the portal, not a redesign.

What an estimate contains​

  • Project: the broader outcome you want, such as "replace phone-and-spreadsheet scheduling with an online portal."
  • Focuses: the pieces of work, each with a name you'd recognize and, where it helps, a short description. A Focus can be something new, such as Customer Scheduling: "Customers can request a service appointment online," or an improvement to software you already have, such as adding CSV export to your reports.
  • Notes: short statements on a Focus or the whole project, such as "Customers cannot book outside the company's service hours." They outline what we currently understand the work to include, and the assumptions the estimate depends on, such as "Assumes a standard SMS provider is fine." They make uncertainty visible without a long specification.
  • T-shirt sizes: each Focus is sized S, M, L, or XL based on how much capacity and uncertainty it carries. Sizes are intentionally coarse.
  • Cost and weeks on every block: for each Focus and for the project, what it would cost and how many weeks it would take on Flex, Core, and Dedicated, at Low, Mid, and High. We don't pick a block for you; you see what each would mean. It's the same whoever will operate the software.
  • Operations, if you'd like Exalynt to run the software: the price of an operations plan per month, quarter, and year once it's live.

The same work costs a little more on Flex and Core, which cost a little more per unit, but comes in smaller steps (details). Most clients mix block sizes along the way, so the final amount usually falls between the blocks' figures.

The weeks assume one block of that type every week, one Focus after another. Buying more than one block a week shortens the timeline; buying less often, or pausing between blocks, lengthens it.

An estimate keeps the prices it was made with. If Exalynt's block prices change afterward, your estimate doesn't.

What each size means​

Each T-shirt size stands for a fixed range of capacity units, the same units blocks are measured in: Flex is 1 unit, Core is 2 units, and Dedicated is 4 units. Your estimate shows cost and weeks rather than units, but every figure on it comes from this mapping:

SizeCapacity unitsOften looks like
LowMidHigh
S123Narrow, familiar behavior with few unknowns.
M346Clear behavior with some workflow, roles, or states to work through.
L6812Broad behavior, several roles or states, or an integration with a system Exalynt doesn't control.
XL121624Large or substantially uncertain. Usually a sign to split it into smaller Focuses.

A Focus's cost on a block is its units at that block's price per unit, and its weeks are its units divided by the block's units. The project's figures are its Focuses' added together.

XL is the largest size, and usually a prompt to split. An XL spans 12–24 units (Mid 16). "Online Payments" covering deposits, card payments, refunds, payment history, and an accounting sync might be XL as one Focus. We'd usually split it into smaller Focuses you can prioritize separately. When an XL can't be split because too much is unknown, such as an integration with a partner's undocumented system, we say what would narrow it, often an early iteration that proves the hard part first.

How to read Low, Mid, and High​

PointWhat it means
LowThe work goes favorably within the scope and assumptions as we currently understand them.
MidThe work goes as expected, based on what we know today.
HighReasonable additional complexity, edge cases, or uncertainty turns up while building the scope as it's currently described.

None of the three is a guarantee. All three describe the scope and assumptions written in the estimate. If those change, we update the range with you.

A practical way to budget is to plan around Mid and make sure High would still work for you.

What an estimate is, and what it isn't​

An estimate isIt isn't
A planning range to help you budget and prioritizeA quote or fixed price
Our best professional judgment of the work as described todayA guaranteed final cost
A snapshot of the Focuses we currently imagineA promise that they'll stay the same; seeing working software often changes your mind, and that's good
A sense of the size of the work and how long it could takeA deadline or delivery date

Why an estimate can change​

An estimate reflects what's known when it's written. It changes when we learn something that matters:

  • New behavior. You decide a Focus should do more, or add a new one.
  • Changed assumptions. Something we assumed turns out not to be true.
  • Newly discovered constraints, technical, organizational, or regulatory.
  • Changed priorities. Your business needs shift, and so does what's worth building.
  • External limits. A third-party system behaves differently than expected or can't do what we need.
  • Discovery. Building part of the project shows that what needs to be built is materially different.

Changes go both ways. Discovery sometimes reveals a simpler path, or that a Focus isn't needed at all. Either way, we tell you what changed and why, update the estimate, and you decide what to do next.

How Exalynt limits your risk​

An estimate gives you orientation. It doesn't ask for a large upfront commitment.

  • You still buy capacity one iteration at a time. You never purchase the whole estimate at once. See Working with Exalynt.
  • You decide at every checkpoint. At the end of each iteration you see what was built and learned, and choose whether to continue, change direction, or stop.
  • New information shapes the plan before you commit more. If priorities or the estimate change, you know before buying the next block.
  • Each block's price is fixed. If work inside a block takes longer than planned, Exalynt absorbs it. See Sharing risk.

Curious how estimates are made? Exalynt engineers follow a shared process, described in Creating project estimates.

Frequently asked questions​

Is an estimate a quote?

No. A quote commits to a fixed price for a fixed scope. An estimate is a planning range based on what's known today, and you still buy capacity one iteration at a time.

Do I have to buy the whole estimated project up front?

No. You buy one iteration at a time and decide at each checkpoint whether to continue. You can stop after any iteration and keep everything built so far.

Which number should I budget for?

Plan around Mid, what the work takes if it goes as expected, and make sure High would still be workable. Low is what the work could take if everything goes favorably.

What happens if the project starts heading past the estimate?

We tell you as soon as we see it, not at the end. Usually it means the scope or an assumption has changed, so we update the estimate and explain why. You then decide whether to continue, simplify, reprioritize, or stop.

Does an estimate tell me when the project will be finished?

Not as a date. It shows how many weeks the work would take on each block, buying one block of that type every week. How quickly the work actually goes depends on the blocks you choose each iteration and how often you buy them.

Which block should I choose?

You don't have to choose up front. The estimate shows every block so you can compare: Dedicated moves fastest and costs least per unit of work, while Flex and Core come in smaller steps. You pick a block one iteration at a time, and can change at any checkpoint. See Engineering Capacity.

Will my estimate change if Exalynt's prices change?

No. An estimate keeps the block prices it was made with. If the scope changes and we update it, it still uses those prices.